Single Thread System Installation

High-Power C-Band Satellite Terminal

3–24

Rev. 0

6. Mount the C-Band SSPA as follows:

a.

Lift the C-Band SSPA
into position on the
vertical pole.

b. Slip a 14” unistrut

over each of pair of
threaded rods (upper
and lower).

Note: Install the 14”
unistruts with the open face
toward the pole as
illustrated below.

c.

Install a 5/16” flat
washer, 5/16” split
lockwasher, and
5/16-18 nut on each
threaded rod.

d. Position the RFT as

desired, and tighten
the 5/16-18 nuts
installed in Step 6.c.

e.

Slide the pipe blocks
inward until they
contact the vertical
pole, then firmly
tighten the 5/16-18
bolts.