2 installation, 1 setting up the instrument, 2installation – Metrohm 766 IC Sample Processor User Manual
Page 14

2.1 Setting up the instrument
766 IC Sample Processor
9
2
Installation
2.1
Setting up the instrument
2.1.1
Packaging
The 766 IC Sample Processor is supplied together with the separately
packed accessories in special packagings containing shock-absorbing
foam linings designed to provide excellent protection. The actual in-
strument is packed in an evacuated polyethylene bag to prevent the in-
gress of dust. Please store all these special packagings as only they
can assure damage-free transport of the instrument.
2.1.2
Check
After receipt, immediately check whether the shipment is complete and
undamaged (compare with delivery note and list of accessories in sec-
tion 6.8). In the case of transport damage, see instructions in section
6.7.1 "Warranty".
2.1.3
Location
Position the instrument in the laboratory at a location convenient for op-
eration, free from vibrations and protected against a corrosive atmos-
phere and contamination by chemicals.
Do not operate the 766 IC Sample Processor without splash protec-
tion 11 and plug cover 23
23 being installed!
2.1.4
Arrangement of the instruments
To make the connection between needle 22 and the injection valve at
the 733 IC Separation Center with the peek capillary 18
18 (length 1 m)
supplied, position the 766 IC Sample Processor immediately on the left
side of the IC system.
Take precautions to ensure that any leaks from pump tubings or
connections cannot cause more damage.