beautypg.com

2 installation, 1 setting up the instrument, 2installation – Metrohm 766 IC Sample Processor User Manual

Page 14

background image

2.1 Setting up the instrument

766 IC Sample Processor

9

2

Installation

2.1

Setting up the instrument

2.1.1

Packaging

The 766 IC Sample Processor is supplied together with the separately

packed accessories in special packagings containing shock-absorbing

foam linings designed to provide excellent protection. The actual in-

strument is packed in an evacuated polyethylene bag to prevent the in-

gress of dust. Please store all these special packagings as only they

can assure damage-free transport of the instrument.

2.1.2

Check

After receipt, immediately check whether the shipment is complete and

undamaged (compare with delivery note and list of accessories in sec-

tion 6.8). In the case of transport damage, see instructions in section

6.7.1 "Warranty".

2.1.3

Location

Position the instrument in the laboratory at a location convenient for op-

eration, free from vibrations and protected against a corrosive atmos-

phere and contamination by chemicals.

Do not operate the 766 IC Sample Processor without splash protec-

tion 11 and plug cover 23

23 being installed!

2.1.4

Arrangement of the instruments

To make the connection between needle 22 and the injection valve at

the 733 IC Separation Center with the peek capillary 18

18 (length 1 m)

supplied, position the 766 IC Sample Processor immediately on the left

side of the IC system.

Take precautions to ensure that any leaks from pump tubings or

connections cannot cause more damage.