Parts list, Bump – RKI Instruments GX-2012 Manual User Manual
Page 185
GX-2012 Operator’s Manual
Parts List • 177
ENTER at any time. If any channel failed the calibration, the buzzer
will sound a double pulsing tone until you press and release the
POWER ENTER button.
•
Disconnect the tubing from the probe.
16. With the BUMP menu option displayed, press the (SHIFT)T button until
the NORMAL menu option is displayed.
17. Press and release the POWER ENTER button to return to Measuring
Mode.
Parts List
Table 10: Sample Bag Calibration Kit Spare Parts
Part Number
Description
81-0016RK-05
Calibration cylinder, 100% volume methane in nitrogen, 58 liter
81-0090RK-01
Calibration cylinder, 3-gas mix, LEL/Oxygen/CO, 34 liter
81-0154RK-04
Calibration cylinder, 4-gas mix, LEL/Oxygen/CO/H2S, 34 liter
81-1001RK
Dispensing valve, for 17/34 liter steel cylinders
81-1051RK
Regulator with gauge and knob, 34AL/58 liter/103 liter cylinders,
0.5 LPM
81-1126RK
Gas bag with clamp and hose barb, 9” x 9”, 2 liter
81-GX03CO-LV
Calibration kit with sample bag, for LEL/Oxy/CO unit, 34 liter steel
81-GX03HSCO-LV
Calibration kit with sample bag, for LEL/Oxy/H2S/CO unit, 34 liter
aluminum
81-GX03VCO-LV
Calibration kit with sample bag, for %VOL(CH4)/LEL/Oxy/CO unit, 34
liter steel
81-GX03VHSCO-LV
Calibration kit with sample bag, for %VOL(CH4)/LEL/Oxy/H2S/CO
unit, 34 liter aluminum
MAINTENANCE
BUMP