beautypg.com

Bump, Turning the lunch break setting on or off – RKI Instruments GX-2012 Manual User Manual

Page 124

background image

116 • Using Maintenance Mode

GX-2012 Operator’s Manual

To return to the main menu, press POWER ENTER at any time. If
any channel failed the calibration, the buzzer will sound a double
pulsing tone until you press and release the POWER ENTER button.

Disconnect the tubing from the probe.

13. Unscrew the demand flow regulator from the calibration cylinder.
14. With the BUMP menu option displayed, press the (SHIFT)T button until

the NORMAL menu option is displayed.

15. Press and release the POWER ENTER button to return to Measuring

Mode.

Turning the Lunch Break Setting On or Off

With LNCH BRK set to OFF (factory setting), the GX-2012 automatically
starts new TWA and PEAK reading collection and resets the time in
operation at startup.
With LNCH BRK set to ON, the Resume Measurements Screen displays

1
12.0

5
23.0

%LEL

%

ppm

ppm

MAINTENANCE

CH

4

O

2

BUMP/

CO

H

2

S

49
12.0

5
25.0

%LEL

%

ppm

ppm

MAINTENANCE

CH

4

O

2

/CAL

CO

H

2

S


MAINTENANCE

BUMP