beautypg.com

2 pneumatic installation – Festo DGC-HD User Manual

Page 24

background image

DGC-HD

24

Festo – DGC-HD – 1304NH English

5.2

Pneumatic installation

For installation in a vertical or inclined position:

Warning

Injury to people and material damage!

If there is a pressure failure, the work mass will

slide down.

Check whether HGL non-return valves are

required. In this way, you can prevent the work

mass from sliding down suddenly.

Check whether safety measures are required to

prevent slow sinking as a result of leakage

(e.g. toothed latches, moving bolts or

emergency buffers).

Fig. 8

Select the suitable compressed air supply ports.

In addition to the supply ports provided at the factory (W), there are also the alternative ports (A).

These are fitted with plug screws.

W(1)

W(2)

A(2)

A(2)

A(2)

A(1)

2

1

1

2

W

=

Supply ports from the plant

1 = End position cover side
1

=

Movement to the cover side

A

=

Alternative ports

2 = End position, connection side
2

=

Movement to the connection side

Fig. 9

For setting the speed:

Rotate the one-way flow control valves GRLA into the supply ports.