beautypg.com

B.1.1 create readiness to operate, B.1.1, Create readiness to operate – Festo Контроллеры двигателя SFC-LAC User Manual

Page 225

background image

B. Supplementary information

B−5

Festo P.BE−GDCP−SFC−LACI−PB−E N en 0812NH

B.1.1

Create readiness to operate

With the transitions only those internal conditions are named
which are new. There must therefore not be any faults for T2.

T

Internal conditions

Actions of the user

T1

SFC−LACI was switched on
No error is detected

T2

Supply voltage applied
Drive control for field bus master

ENABLE = 1 (drive enabled)
CCON = xxx0.xxx

1

T3

STOP = 1
CCON = xxx0.xx

11

T4

STOP = 0
CCON = xxx0.xx

01

T5

ENABLE = 0
CCON = xxx0.xxx

0

T6

ENABLE = 0
CCON = xxx0.xxx

0

T7*

Fault detected

T8

Reaction to fault completed, drive stopped

T9

A fault is no longer present
Was a serious error

RESET = 0

→1 (acknowledge fault)

CCON = xxx0.

Pxxx

T10

A fault is no longer present
Was a slight error

RESET = 0

→1 (acknowledge fault)

CCON = xxx0.

Pxx1

T11

Fault is still present

RESET = 0

→1 (acknowledge fault)

CCON = xxx0.

Pxx1

Key: P = positive edge

N = negative edge
x = any