Cascading configurations), Ns in, Transferring business tasks from – HP StorageWorks XP Remote Web Console Software User Manual
Page 72
![background image](/manuals/398401/72/background.png)
72
Continuous Access XP Journal operations requirements and restrictions
2.
If a pair resynchronization has not been performed to reverse the Continuous Access XP Synchronous
pair’s primary/secondary relationship (that is, if the pair is suspended), use RAID Manager XP to
resynchronize the pair, so the primary/secondary relationship is reversed.
Figure 31
Changing to a 3DC multi-target configuration after recovering from primary site failures
Transferring business tasks from Continuous Access XP secondary sites to primary sites (in 3DC
cascading configurations)
If you follow the instructions in ”
Recovering from primary site failures
” on page 70 and the system
changes to a 3DC cascading configuration, you can transfer your business tasks back to the primary site
after removing failures from the primary site and other locations.
To transfer your business tasks back to the primary sites:
1.
Stop your business tasks at the Continuous Access XP Synchronous secondary site.
2.
Use RAID Manager XP to execute the
horctakeover
command on the Continuous Access XP
Synchronous pair. The system configuration returns to a 3DC multi-target configuration.
3.
Use the primary volume at the primary site to resume your business tasks.
Figure 32
Transferring business tasks from Continuous Access XP secondary sites to primary sites (in 3DC
cascading configurations)