beautypg.com

Estimating licensed capacity, Software and licensed capacity – HP XP P9500 Storage User Manual

Page 68

background image

In the Grace Period term, the operation can be performed in the same manner as the Installed
status. However, as the license capacity of the meter key continues to be subtracted, the subtraction
continues even if the license capacity of the meter key becomes a negative value. For example:

If the licensed capacity of the meter key is -10 TB and 20 TB of license capacity is installed,
the remaining licensed capacity becomes 10 TB.

If the licensed capacity is a negative value and more licensed capacity of the permanent key
than the used capacity is installed, the meter license is deleted.

If the license key for the deficient amount of capacity is not installed within the 30 days, the status
changes to Not Enough License, and the software application is disabled. If a permanent key
with more licensed capacity than the used capacity is installed, the meter license is deleted.

Estimating licensed capacity

The licensed capacity is volume capacity that you are licensed to use with the software application.
You need to estimate the amount of capacity which you want to use with the software application
before you purchase the permanent key, the term key, or the meter key.

Software and licensed capacity

Three licensed capacity types are available. The one you choose depends on the software. The
following table shows the licensed capacity types:

Table 19 Licensed capacity types

Description

Type

The licensed capacity is estimated by using one of the following capacities, which depends
on the software product.

Used capacity

Normal volumes (LDEVs)

External volumes mapped to the storage system

Pools

The licensed capacity is estimated using the capacity of all the LDEVs in the storage system.

Mounted
capacity/Usable
capacity

You can use the software regardless of the volume capacity.

Unlimited capacity

The following table lists the software and the licensed capacity.

Table 20 Software and licensed capacity

Notes

Licensed capacity

Option name

Used only for open-system devices, including LUN
Manager, Open Volume Management, Volume

Mounted capacity

Open Systems Array Management

Shredder, Cache Residency, Data Retention, Database
Validator, and Cache Partition

Used only for open-system devices, including Virtual
LVI, Cache Residency Z, Volume Retention

1

Mounted capacity

Mainframe Array Management

To use Auto LUN, first install Performance Monitor.

Mounted capacity

Performance Monitor

Auto LUN

Mounted capacity

Auto LUN V2

Used capacity for
normal volumes

2

Continuous Access Synchronous

Used capacity for
normal volumes

Continuous Access Synchronous Z

68

License keys

This manual is related to the following products: