beautypg.com

Master-slave series operation, Ge 85, Operation – GW Instek PSW-Series User Manual User Manual

Page 85

background image

OPERATION

85

5. Connect the master and slave unit in series as

shown above.

6. Reattach the terminal cover.

Page 44

Note

Ensure load cables have sufficient
current capacity.

Page 41

Re-attach the protection dummy plug when not in
use.

Master-Slave Series Operation

Master-Slave
Configuration

Before using the power supplies in series, the
master and slave units need to be configured.

1. Configure the OVP and OCP

settings for the master unit.

Page 57

2. For each unit, hold the Function

key while turning the power on to
enter the power on configuration
settings.

A

W

V

W

%W

100

80

60

40

20

ISR

C C

DLY

ALM

RMT

C V

VSR

Function

OVP/OCP

Set

Output

PWR DSPL

Lock/Local

Test

PSW 30-36

360W

Voltage

Current

Multi-Range DC Power Supply

3. Configure F-93 (Master/Slave)

setting for each master/slave unit.

Page 114

Unit

F-93

Master (local or series operation)

0

Slave unit (series)

4

4. Cycle the power on the units (reset the power).