Operation, Reminder to eq settings/info, Soc connect settings/info – Magnum Energy ME-RTR Router User Manual
Page 71: Time connect settings/info, Vdc connect settings/info

Page 63
©
2014 Magnum Energy, Inc.
Operation
•
Reminder to EQ – This display indicates that it is time to EQ your batteries. This occurs when
the SETUP: 03G Days to remind when to EQ setting has been enabled and the # of days has been
exceeded.
Info: The Reminder to EQ display is reset by initiating an EQ charge cycle, or by turning
the SETUP: 03G Days to remind when to EQ setting to OFF.
Reminder to EQ appears on LCD. PWR (green) LED
is on solid and CHG (green) LED blinks.
FAULT
PWR
CHG
INV
Reminder to EQ
Settings/Info...
Figure 5-25, Reminder to EQ Mode
SOC Connect appears on LCD. PWR (green) LED is on
solid and CHG (green) LED is blinking.
FAULT
PWR
CHG
INV
SOC Connect
Settings/Info...
Figure 5-26, SOC Connect Mode
•
SOC Connect – AC power is present at the inverter’s AC input, but not allowed to connect.
The battery bank’s State of Charge needs to reach the Connect SOC setting from the SETUP: 02E
AC In – SOC menu in order for the inverter/charger to connect to the incoming AC.
Time Connect appears on LCD. PWR (green) LED is
on solid and CHG (green) LED blinks.
•
Time Connect – AC power is present at the inverter’s AC input, but not allowed to connect.
The time of day needs to fall within the Connect time and the Disconnect time settings per the
SETUP: 02C AC In – Time menu in order for the inverter/charger to connect to the incoming AC.
FAULT
PWR
CHG
INV
Time Connect
Settings/Info...
Figure 5-27, Time Connect Mode
FAULT
PWR
CHG
INV
VDC Connect
Settings/Info...
VDC Connect appears on LCD. PWR (green) LED is on
solid and CHG (green) LED blinks.
•
VDC Connect – AC power is present at the inverter’s AC input, but not allowed to connect.
The battery voltage needs to fall below the Connect volts setting from the SETUP: 02D AC In –
Volts DC menu in order for the inverter/charger to connect to the incoming AC.
Figure 5-28, VDC Connect Mode