HEIDENHAIN TNC 407 (243 020) Service Manual User Manual
Page 103

SERVICE MANUAL TNC
Issue: 01.09.1995
Page 85
17.4.3 Flow Diagram: TNC 415
Output: “Control
Ready for Operation”
Switch off
Switch off
Switch
Communication
Geometry
Input: Acknowledgement
“Control Ready for Operation”
I
I
I I
I I
I I
I
I
1
3
3
3
max.
max.
max.
I
114 ms
114 ms
Time
Remarks
Error Message
1
POWER INTERRUPTED
2
Waiting for control voltage
RELAY EXT. DC VOLTAGE MISSING
3
After switching off the output “Control Ready
for Operation”, the “Acknowledgement Control
YX
Ready for Operation” must be switched off
Communication processor
within 146 ms; otherwise a blinking error
Geometry processor
message is generated.
1. CLP processor
4
If the acknowledgement is switched off during
EMERGENCY STOP
operation, the error message is displayed.
This manual is related to the following products: