Starting a site controller ii system, Introduction – Gasboy CFN Series SCII Start-Up Manual User Manual
Page 9
03/07/03
1-1
Section 1
STARTING A SITE CONTROLLER II SYSTEM
INTRODUCTION
This Start-Up Manual is provided to assist you in the start-up of a GASBOY CFN Site Controller II
or Islander II System. The CFN Series System is a computerized data acquisition system. As the
start-up person, you should already be familiar with all the CFN Site Controller II and Islander II
manuals. Proper installation according to the CFN Site Controller II or Islander II Installation
Manual is critical to ensure correct and trouble-free operation. The CFN Site Controller II and
Islander II systems include a one year parts and labor warranty against defective material and/or
workmanship. See the Warranty page at the back of this book for details.
NOTE: Noncompliance with the specifications of the CFN Site Controller II or Islander II
Installation Manuals and the checks in the accompanying Start-up Form
could void the warranty.
As you are performing the start-up process, any deviations from the specifications listed in the
Site Controller II or Islander II Installation Manuals should be corrected. If any tests fail, correct
the wiring or system problem and perform the test again. If you have any questions, cannot
proceed to the next step, or you want authorization for exceptions, please contact GASBOY
Technical Service at:
☎
1-800-444-5529
In addition to this manual, the customer should have these additional GASBOY CFN Series
manuals:
•
Site Controller II Installation Manual, C01918
Contains instructions, restrictions and guidelines for planning, laying out, and wiring the Site
Controller II System.
•
Site Controller II Site Manager's Manual, C09212
Contains detailed instructions for setting up or maintaining the Site Controller II. It also
contains descriptions of system features, data terminal commands, transaction processing
and system maintenance.
•
Islander II Installation Manual, C35963
Contains instructions, restrictions and guidelines for planning, laying out, and wiring the
Islander II System.
Depending on the site configuration, the customer may also have these manuals:
•
CFN Card Encoding Manual C01687
Describes the cards, field descriptions, layouts, and filling out the card encoding form.
Covers both encoding of mag cards and punching of optical cards.
•
Debit and Credit Card Networks Manual
Formerly C09207, now based on router/network type. Describes the various network
interfaces for the Site Controller II.
•
CheckPoint Reference Manual, C09204
Describes the operation of the CheckPoint Console.