beautypg.com

Gasboy CFN Series SCII Start-Up Manual User Manual

Page 60

background image

CFN Series System

7-2

03/07/03

g.

Turn off all hoses.

h.

Place the system override switch, for Hose 1 in the ON position.

i.

Repeat Steps d through h for all remaining hoses. Substitute the hose number being
tested for hose 1 until all hoses have been tested.

j.

Replace all connectors and reassemble.

This manual is related to the following products: