Start-up overview – Gasboy CFN Series SCII Start-Up Manual User Manual

Page 10

background image

CFN Series System

1-2

03/07/03

Profit Point Reference Manual, C09203
Describes the operation of the Profit Point Console.

Profit Point Clerk's Manual, C09201
Describes all point-of-sale operations for the Profit Point Console.

Point of Sale and Shift Change Manual, C09215
Describes POS and shift change operations.

Star Receipt Printer Manual C08951
Describes the operation of the Star Receipt Printer.

Series 9800 Installation/Operation Manual 035235
Describes installation/operation for Series 9800 pumps/dispensers.

Fuel Point Reader Installation and Retrofit Instructions Manual, C35628

Fuel Point Dispenser and Hose Retrofit Manual, C35593

Fuel Point Vehicle Module Installation Manual, C35699

Fuel Point Vehicle Module Programming Manual, C35629

Fuel Point Parts Manual, C35709

START-UP OVERVIEW

Start-up for the CFN Site Controller II or Islander II system consists of:

gathering site information from customer for loading into system

verifying the physical system layout

making sure the system complies with the guidelines and restrictions outlined in the system
Installation Manual and this manual.

testing the system

helping the system user execute the commands needed to start the system

helping the system user back up release disks and explaining backup procedures

making sure the system user understands how to use the system

filling out the GASBOY CFN System Start-up Form (CFN1-SUF)

This manual is related to the following products: