beautypg.com

Component power-up and configuration – Gasboy CFN Series SCII Start-Up Manual User Manual

Page 61

background image

03/07/03

8-1

Section 8

COMPONENT POWER-UP AND CONFIGURATION

1.

Turn on the AC POWER for all system devices as follows:

Power Conditioner/AC Surge Protector Strip
Plug in device. Turn on power switch if applicable.

CRT Terminal
Locate the AC power switch on the CRT terminal and/or printer and turn on. See the
operator's manual for data terminal switch settings and LED indicators. If using a Link
terminal/Okidata printer combination, see the setup parameters later in this section.

Logger (if separate from data terminal)
Locate and turn on the AC power switch for the logger.

CheckPoint or Profit Point
CheckPoint: Locate the AC power switch on the back side of the unit. Push the switch down
to the ON position marked 1. Verify that the console is on by observing the display on the
front of the unit. If the site has an optional customer display, verify that it is also working.

Profit Point: Locate the AC power switch on the front lower righthand side of the monitor and
the AC power switch on the back righthand side of the Profit Point console. Push the switch
for the monitor into the ON position; then do the same for the console. Verify that it powers
up.

Site Controller
Locate the AC power switch on back lefthand side. Push the switch down to the ON position
marked 1.

Verify that the Site Controller is operating properly by observing the LEDs in the front window
of the unit. See the CFN Diagnostic Manual. Verify that power up message prints on CRT.

Islander (See next page for details)

Island Card Reader (ICR)
Locate the AC power switch inside the ICR assembly, upper righthand corner and turn it up
to the ON position. Verify that the two power supply LEDs (red) are lit. Verify that the two
422 communication LEDs (red), located on the upper lefthand corner of the reader CPU
board, are flashing.

Pump Control Unit(s)
Locate AC power switch and battery switch and turn them on. Verify that the two power
supply LEDs (red) are lit. Verify that the two RS-485 communication LEDs (red) on the pump
control CPU board are flashing.

Electronic Pumps and Dispensers
Locate and turn on power switches. Refer to pump documentation or call GASBOY
Technical Service for information.

Standalone Receipt Printer (optional)
Locate the AC power switch on the front of the unit. Push the switch to the right (ON)
position.

This manual is related to the following products: