beautypg.com

Gasboy CFN Series SCII Start-Up Manual User Manual

Page 117

background image

3

6.

SYSTEM ENVIRONMENT

Site Controller/Islander: ________________________________________________________________________
Console: ___________________________________________________________________________________
PCU(s): ____________________________________________________________________________________
ICR(s): _____________________________________________________________________________________
Profit Point(s): _______________________________________________________________________________
FPR's: _____________________________________________________________________________________

7.

CONDUIT

All Metal Conduit? Y / N

AC and DC in Separate Conduit? Y / N

Wiring Neatness: Good/Fair/Bad

Is shielded cable (as specified in the Installation Manual) used? Y / N

If you answered NO to the above questions, contact GASBOY before proceeding.

8.

SYSTEM POWER

Power Conditioner:

Hot to Neutral ________ VAC Hot to Ground _____ VAC Neutral to Ground _____ VAC

AC Surge Protector:

Hot to Neutral ________ VAC Hot to Ground _____ VAC Neutral to Ground _____ VAC

Islander:

Hot to Neutral ________ VAC Hot to Ground _____ VAC Neutral to Ground _____ VAC

PCU'(s):

Hot to Neutral ________ VAC Hot to Ground _____ VAC Neutral to Ground _____ VAC

ICR'(s):

Hot to Neutral ________ VAC Hot to Ground _____ VAC Neutral to Ground _____ VAC

FPR'(s):

Hot to Neutral ________ VAC Hot to Ground _____ VAC Neutral to Ground _____ VAC

Grounding method:

9.

DC POWER

Site Controller/Islander: +5 VDC _______ +12 VDC _______ -12 VDC _______
PCU'(s): +5 VDC _______ +12 VDC _______
ICR'(s): +5 VDC _______ +12 VDC _______
Current Loop Interface: +5 VDC _______ + 12VDC _______ -12 VDC _______
Consoles: +5 VDC _______ + 12VDC _______ -12 VDC _______ +9 VDC _______
FPR'(s): +5 VDC _______

10. SYSTEM APPROVALS

Customer Comments: __________________________________________________________________________

____________________________________________________________________________________________
____________________________________________________________________________________________

Site Manager: _________________________ Date: _______

I am satisfied with the installation of the GASBOY
CFN System and have been trained in its use and
operation.

Start-up Tech: _________________________ Date: _______

11. CUSTOMER KNOWLEDGE ___________________________________________________

Time Spent on Training:

Names of People Trained:

Were test cards locked out? Y / N

Who were test cards left with?

Was backup copy made of system and any configuration changes? Y / N

Remarks:

(Use additional sheets if necessary)

____________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

This manual is related to the following products: