Gasboy CFN Series SCII Start-Up Manual User Manual
Page 117
3
6.
SYSTEM ENVIRONMENT
Site Controller/Islander: ________________________________________________________________________
Console: ___________________________________________________________________________________
PCU(s): ____________________________________________________________________________________
ICR(s): _____________________________________________________________________________________
Profit Point(s): _______________________________________________________________________________
FPR's: _____________________________________________________________________________________
7.
CONDUIT
All Metal Conduit? Y / N
AC and DC in Separate Conduit? Y / N
Wiring Neatness: Good/Fair/Bad
Is shielded cable (as specified in the Installation Manual) used? Y / N
If you answered NO to the above questions, contact GASBOY before proceeding.
8.
SYSTEM POWER
Power Conditioner:
Hot to Neutral ________ VAC Hot to Ground _____ VAC Neutral to Ground _____ VAC
AC Surge Protector:
Hot to Neutral ________ VAC Hot to Ground _____ VAC Neutral to Ground _____ VAC
Islander:
Hot to Neutral ________ VAC Hot to Ground _____ VAC Neutral to Ground _____ VAC
PCU'(s):
Hot to Neutral ________ VAC Hot to Ground _____ VAC Neutral to Ground _____ VAC
ICR'(s):
Hot to Neutral ________ VAC Hot to Ground _____ VAC Neutral to Ground _____ VAC
FPR'(s):
Hot to Neutral ________ VAC Hot to Ground _____ VAC Neutral to Ground _____ VAC
Grounding method:
9.
DC POWER
Site Controller/Islander: +5 VDC _______ +12 VDC _______ -12 VDC _______
PCU'(s): +5 VDC _______ +12 VDC _______
ICR'(s): +5 VDC _______ +12 VDC _______
Current Loop Interface: +5 VDC _______ + 12VDC _______ -12 VDC _______
Consoles: +5 VDC _______ + 12VDC _______ -12 VDC _______ +9 VDC _______
FPR'(s): +5 VDC _______
10. SYSTEM APPROVALS
Customer Comments: __________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
Site Manager: _________________________ Date: _______
I am satisfied with the installation of the GASBOY
CFN System and have been trained in its use and
operation.
Start-up Tech: _________________________ Date: _______
11. CUSTOMER KNOWLEDGE ___________________________________________________
Time Spent on Training:
Names of People Trained:
Were test cards locked out? Y / N
Who were test cards left with?
Was backup copy made of system and any configuration changes? Y / N
Remarks:
(Use additional sheets if necessary)
____________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________