beautypg.com

Burner cycle, 1 steps, 4burners – Pilz PNOZ m1p base unit User Manual

Page 48: 4 burner cycle

background image

Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]

4-11

4.4

Burner cycle

4

Burners

4.4

Burner cycle

4400

Burner cycle

4-

4.4.1

Steps

Steps

4-

Funktionsbeschreibung_Schritte

Each step has a fixed step identifier (0 ... 31).

The steps are performed consecutively within the burner cycle (step 1

first, then step 2).

Some steps are only important internally and are not displayed (e.g. step

4). That's why some numbers from 0 to 31 are not listed as steps.

The length of the steps depends on the configuration and the burner cy-

cle. There are steps for which you can set a step time in the PNOZmulti

Configurator; others have a fixed step time, or the step time depends on

the burner cycle.

A step time cannot be set for the following steps. They are run in each

burner cycle, irrespective of the configuration.

Step 0: Burner switched off

Step 1: Check start conditions

Step 18: Burner in operation/controller enable

A step time can be set for the following steps. Your configuration will de-

termine which of these steps are performed in your burner cycle.

Step 2: Start-up combustion air blower

Step 3: Compound controller to pre-purge position

Step 5: Pre-purge/tightness control: Vent

Step 6: Pre-purge/tightness control: Test air pressure

Step 7: Prepurge/tightness control, filling:

Step 8: Prepurge/tightness control, test fuel pressure

Step 9: Continue pre-purge

Step 10: Compound controller to ignition position

Step 12: Pre-ignition

Step 13: Ignite ignition flame/1st safety time

Step 14: Stabilise ignition flame

Step 15: Ignite main flame/2nd safety time

Step 16: Stabilise main flame

Step 17: Burner in operation/start position

Step 20: Afterburn

Step 21: Post-purge

Step 22: Run down combustion air blower

Step 24: Tightness control, vent

Step 25: Tightness control, test air pressure

Step 26: Tightness control, filling

Step 27: Tightness control, test fuel pressure