Commissioning the safety system, 1 preparing for commissioning, 3safety mat/safe edge – Pilz PNOZ m1p base unit User Manual
Page 32: 5 commissioning the safety system
Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]
3-5
3.5
Commissioning the safety system
3
Safety Mat/Safe Edge
3.5
Commissioning the safety system
3500
Commissioning the safety system
3-
Schaltmatte_Sicherheitssystem in Betrieb nehmen-einleitung
When using the pressure-sensitive protective device, please note the
following:
The following are not permitted: Walking aids such as canes and
wheeled vehicles
3.5.1
Preparing for commissioning
Preparing for commissioning
3-
Schaltmatte_Sicherheitssystem in Betrieb nehmen-vorbereiten
Please note the following when preparing for commissioning:
Cables that have to be laid outside the control cabinet must be pro-
tected from mechanical damage, e.g. by installing them in a conduit.
Pressure-sensitive protective devices may not be fitted with a termi-
nating resistor.
The configured test pulse outputs should be used exclusively for test
pulses on the pressure-sensitive protective devices. Be sure to note
the information provided in "Technical details".