Form I-RDH/REH/RHH/RXH (12-14), Page 64

APPENDIX

Job Name:

Contractor Contact:

Street Address

Contractor Phone:

City, State, Zip

Model #

Date:

Serial #

Contractor:

Tag:

General Checks

Reference

NOTE: Checks may not apply depending on option selection.

Inspect unit for damage.

Paragraph 3.0

Verify shipping brackets are removed.
Check fuses/breakers for correct sizing. (Check rating plate for electrical requirements.)
Check clearances.

Paragraph 4.1

Check all condensate connections. Fill all traps.

Paragraph. 6.2 &

Paragraph 6.6

Verify air filters are installed.
Inspect dampers.
Tighten all screws on pulleys and fans.

Paragraph 6.9

Check and tighten all electrical terminals.
Seal electrical entrances.
Check optional dirty filter switch.

Paragraph 7.6.3

Check for manual resets (firestat, high gas pressure switch).
Verify all copper tubing is isolated and does not rub.
Verify crankcase heater energized 24 hrs before startup.

Blower Assembly

Fan alignment Motor HP: ________ Name Plate Amps: ______

Belt tension

Motor Make/Amps: L1 L2 L3
______________ ______ ______ ______

VAV controls

Reheat Compressor Data

Outdoor Air Conditions:

Dry Bulb: _______________

Wet Bulb: ____________

Circuit

L1

L2

L3

Name Plate RLA Head Pressure PSIG

Suction Pressure PSIG

Reheat

Gas Heating Section

LP

Natural Gas

Leak test gas piping

Purge air from lines

Check Inlet Gas

Pressure

Maximum: 14” w.c. for both

natural gas and LP

Actual Gas Inlet

Pressure: _________

Minimum: As listed on the

unit rating plate

Check Manifold Pressure (As listed on the rating plate.)

Actual Manifold Gas Pressure:____________

Electric Heating Section

Heater Number and Amps:

1

2

3

4

5

6

Start-Up Checklist

NOTE: See

Paragraph 9.0 for

complete list.

STARTUP FORM

Fill out the applicable sections and keep for future reference.