Index – Reznor RPBL Unit Installation Manual User Manual
Page 59

Form I-SSCBL/RPBL, P/N 149159 R7, Page 59
INDEX
A
Optional Airflow Proving
B
Brackets for Attaching the
Concentric Adapter Box 20,
Burner Air Shutters 52
C
Check Installation and
Check Valve Outlet 14
Cleaning Pilot and Main
Cleaning the Heat Exchanger
Clearances to a Horizontal
Vent Terminal 19
Optional Cooling Coil Cabinet
Combustion Air Inlet 22
Combustion Air Inlet Pipe 15
Combustion Air Proving Switch
Concentric Adapter Box 15,
Concentric Adapter Box Airflow
Connections at the Concentric
Locations of Standard and
D
Inlet Air Damper Linkage 28
Optional Dampers and
Mounting Support Dimensions
Dimensions - Concentric
Dimensions - Optional Cooling
E
Electrical Supply and
Optional Electronic Modulation
Electronic Modulation between
Electronic Modulation between
Optional Evaporative Cooling
Exhaust (Vent) Terminal 22
F
Optional Filter Rack and Filters
G
Gas Valve 54
H
Horizontal Vent Instructions
Horizontal Vent Kit 19
Horizontal Vent Kit Option CC6
I
Installation Instructions for
Horizontal Vent Kit 19
Installation Instructions for
Vertical Vent Kit 22
Installation of Model SSCBL
with Vertical Vent 25
INSTALLATION RECORD 60
J
join Double-Wall (Type B) Pipe
and the Vent Terminal Cap
join the Double-Wall (Type
B) Pipe to the Taper-type
L
Optional High Ambient Limit
M
Manifold or Orifice (Valve
Outlet) Pressure Settings
O
100% Outside Air Hood 26
P
R
Reverse Flow, Limit Control
Roof Curb Assembly and
S
Screened Air Hood for 30%
Outside Air Opening 27
Screened Exhaust Assembly
Duct Temperature Sensor 47
Shipped-Separate
Stage Adder Module 4
Supply Voltage and Wiring 41
T
Remote Temperature Selector
Optional Two-Stage Operation
Typical Separated-Combustion
U
V
Optional Variable Frequency
Vent/Combustion Air Terminal
Horizontal Vent Terminal/
Combustion Air Package
Venting and Combustion Air
Vertical Flue Discharge
Vertical Vent Instructions 22,
Vertical Vent Kit 22
W