beautypg.com

AERCO SmartPlate User Manual

Page 3

background image

SmartPlate Installation, Operation & Maintenance Manual

OMM-0069_0E

AERCO International, Inc.

 100 Oritani Dr.  Blauvelt, NY 10913

Page 3 of 138

SP-100

Phone: 800-526-0288

PRI: 11/26/2013

TABLE OF CONTENTS

CHAPTER 1.

  GENERAL INFORMATION .................................................................................. 5 

1.1 INTRODUCTION ................................................................................................................................... 5 
1.2 ELECTRONIC CONTROL SYSTEM/SMARTPLATE (ECS/SP) .................................................................... 6 

1.2.1 Control Box Assembly ................................................................................................................... 7 
1.2.2 Feed‐Forward Temperature Sensors ............................................................................................ 7 
1.2.3 Outlet Temperature Sensors ........................................................................................................ 7 
1.2.4 Boiler Water Inlet/Outlet Temperature Sensors .......................................................................... 7 

1.3 SMARTPLATE PIPING ASSEMBLIES ...................................................................................................... 8 
1.4 ELECTRONIC CONTROL VALVE, MXG‐461 ............................................................................................ 8 

CHAPTER 2.

  INSTALLATION .................................................................................................. 11 

2.1 INTRODUCTION ................................................................................................................................. 11 
2.2 RECEIVING AND UNPACKING SMARTPLATE ...................................................................................... 11 
2.3 SITE SELECTION AND PREPARATION ................................................................................................. 11 

2.3.1 Installation Clearances ................................................................................................................ 11 
2.3.2 Setting the Unit ........................................................................................................................... 12 
2.3.3 Repositioning ECS/SP Control Box .............................................................................................. 14 

2.4 HEATING FLUID AND DOMESTIC HOT WATER (DHW) PIPING........................................................... 15 
2.5 SMARTPLATE ELECTRICAL WIRING CONNECTIONS ........................................................................... 16 

CHAPTER 3.

  FUNCTIONAL DESCRIPTION ........................................................................... 21 

3.1 INTRODUCTION ................................................................................................................................. 21 
3.2 MECHANICAL OVERVIEW .................................................................................................................. 21 
3.3 ELECTRONIC CONTROL OVERVIEW ................................................................................................... 22 
3.4 OVER‐TEMPERATURE CONTROL AND SAFETY FEATURES ................................................................. 22 

CHAPTER 4.

  ADJUSTMENT ................................................................................................... 25 

4.1 INTRODUCTION ................................................................................................................................. 25 
4.2 SMARTPLATE 3‐WAY CONTROL VALVE, MXG‐461 ADJUSTMENT ..................................................... 25 

4.2.1 Control Valve Calibration and Status Indications ....................................................................... 25 
4.2.2 Manual Control of 3‐Way Valve – Removable Handwheel to Hamper Tampering .................... 28 
4.2.3 Setpoint Temperature Adjustment ............................................................................................ 29 
4.2.4 Over‐Temperature Alarm Limit Adjustment ............................................................................... 32 

CHAPTER 5.

  OPERATION ....................................................................................................... 35 

5.1 INTRODUCTION ................................................................................................................................. 35 
5.2 PRE‐OPERATIONAL CHECKS & PROCEDURES .................................................................................... 35 
5.3 INITIAL START‐UP .............................................................................................................................. 36 
5.4 SHUTTING DOWN THE SYSTEM ......................................................................................................... 37 

CHAPTER 6.

  SCHEDULED MAINTENANCE .......................................................................... 39 

6.1 INTRODUCTION ................................................................................................................................. 39 
6.2 BOILER WATER DIFFERENTIAL PRESSURE GAUGE CHECK ................................................................. 39 
6.3 PLATE PACK LEAKAGE CHECKS (DOUBLE‐WALL MODELS ONLY) ....................................................... 40 
6.4 OVER‐TEMP SWITCH CHECK .............................................................................................................. 41 
6.5 STRAINER INSPECTION AND CLEANING ............................................................................................ 42 
6.6 CONTROL VALVE OPERATIONAL CHECK ............................................................................................ 42 
6.7 TEMPERATURE SENSOR CHECKS ....................................................................................................... 42 
6.8 RECIRCULATION PUMP CHECK .......................................................................................................... 42 
6.9 PERIODIC CLEANING OF HEAT EXCHANGER ...................................................................................... 43