5 commissioning, 1 general system structure, 2 wiring the hardware – Lenze PLC Designer R3-x User Manual
Page 18: Commissioning, 5commissioning
Commissioning
General system structure
18
Lenze · Commissioning of Lenze drives · 1.3 EN - 06/2014
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
5
Commissioning
This chapter describes the commissioning of a sample project by means of examples. The following
requirements have to be met, so that the respective sample project can be used.
5.1
General system structure
The Lenze project examples are based on the following system structure.
• The Controller is the central control component of the system configuration.
• The sample projects are available for the following bus systems: CAN/EtherCAT.
5.2
Wiring the hardware
Before you can work with the project, the hardware has to be connected to each other. The sample
projects are configured so that the motors rotate if a controller is used as fieldbus node.
• Connect the desired Controller with the fieldbus nodes.
• Connect the devices (controllers, motors) with the corresponding voltage supply
• Connect the components with a suitable fieldbus cable.
[5-1]
System structure with a Controller (Logic)
Further information on the electrical connections can be found in the documentation
supplied. Please read the mounting instructions supplied with the controller first before
you start working!
The mounting instructions include safety instructions which must be observed!