Figure 570-4 – ADC Soneplex Broadband System User Manual
Page 237

ADCP-61-471 • Issue 4 • June 2000 • Section 2: Operation and Maintenance
2-214
© 2000, ADC Telecommunications, Inc.
DLP-570
Page 4 of 18
7. To start a test, set the Measurement field to START. The RTAU waits for pattern sync or
frame sync (for framed patterns) before beginning measurement (see
syncing, the test begins and the Measurement display changes to RUNNING.
8. As a test progresses, the results are displayed on the RTAU Config screen, in the 'Error
Counts' and 'Elapsed Time' columns.
9. To terminate a test, set the Measurement field to STOP. Setting the Mode field to
DISABLE also stops any measurements in progress and terminates the test.
10. To end a test session and restore the tested circuit to normal operation, set the Mode field to
DISABLE.
Stop! You have completed this procedure.
14866-A
RTAU CONFIG
EQUIPMENT SETUP
===============
Current User : CRAFT Test Circuit: 1-1
Line Code : INTERNAL Mode : DISABLE
SIGNAL GENERATOR SETUP
======================
Pattern Type : QRS -------------------------------------
Frame Format : UNFRAMED
Loop Code : NONE ---------------
BIT ERROR SETUP Error Counts Status Elapsed Time
=============== ============ ====== ============
Error Count : 0 Data : F Sync: ES :
Error Rate : OFF BPV : P Sync: EFS:
Error Locn : N/A Frame: RAI :
CRC :
COFA :
Test Timeout : 60 Measurement : STOP
In Minutes
Press CONTROL-A For Assistance
Figure 570-4. RTAU Config Screen
(Showing Defaults for Screen With Line Code Field Set to INTERNAL)