beautypg.com

Getting started, Preparation, Etting started – GW Instek GLC-9000 User Manual User Manual

Page 37

background image

GETTING STARTED

37

G

ETTING STARTED

This chapter describes the GLC-9000 in a nutshell, including the
main features, front and rear panel descriptions, and the power up
sequence.

Preparation

Voltage Line
Selection

Before power is turned on,
ensure the line voltage is
correct for the environment.
The line voltage is shown on
the rear panel.
Voltage: 100/120/220/230V
±10% Frequency: 50~60Hz









Warning

Ensure a three pronged grounded power socket is
used.

Fuse

Ensure the correct fuse is used
before power up. (Fuse:
T0.4A/250V)





































2

3

4

5

1

6



EUT AC Line In

Before connecting power to the
EUT AC Line In, confirm the
EUT input power and test
requirements do not exceed the
EUT AC Line In requirements.
Voltage Range: 85V ~ 250V / 50
~ 60Hz





































2

3

4

5

1

6

Caution

* EUT : 10A(max), 1500VA(max)