beautypg.com

Confirming proper setup – Paradyne JetFusion Integrated Access Device User Manual

Page 40

background image

2000-A2-GB20-10

- 21 -

February 2004

Making RJ21X Connections (16/24-Port)

The pin assignments for the RJ21X connector are telco standard. Connect
telephone devices from an RJ11 jack field, or a punch down block. Each
line provides a two-wire loop or groundstart connection. To perform the
connection, use a customer-provided cable terminated at one end with an
RJ21X connector. After connecting each color-coded wire pair to the
corresponding telephone connection on the jack field or punchdown block,
connect the RJ21X connector to the connector on the IAD rear panel.

Confirming
Proper
Setup

When you have completed the tasks in this chapter, reset the IAD and test
your configuration.

Reset the IAD

Reset the IAD (page

14

) to synchronize the physical connections.

Verify Normal Power Up and Operation

Finally, to test your configuration for proper data and voice operation,
perform the operational test (

Operational Test

on page

247

).