Appendix D: Acceptance Test Procedures

74

Siemens Energy & Automation, Inc.

ISGS Acceptance Test

Directional Phase Time Overcurrent (67) Function

(Phase-Phase Connected VTs)

Set the ISGS as follows:
Parameter Set A

7103

5000:5 Current Transformer (CT)

1101

Curve SEA 5, Very Inverse

1902

1 A Nominal Pickup

1903

Time Dial per Chart

1905

Impedance to 45°

1907

Direction to Reverse

1908

Trip Matrixed to Trip 1 Contact

6401

Enable 67

1901

Disable Other Conflicting Functions

1501, 1551, 1601, 1651, 1801, 1901, 2001, 2301

Raise 51 Pickup To Maximum

1703

Phase

A B C

Connections
1. Connect the appropriate source of control voltage to terminals 13 (+) and 12 (-).

Relay Disabled contact on terminals 19 and 20 opens.

2. Connect suitable variable source current

to phase A, terminals 3 and 4,

to phase B, terminals 5 and 6,

to phase C, terminals 7 and 8,

to neutral, terminals 9 and 10,

3. Connect suitable AC voltage

to phase A-B, terminals 41 and 42,

to phase B-C, terminals 43 and 44,

to phase C-A, terminals 45 and 46,

Connect timer to Trip 1 contacts, terminals 1 and 2.

Pickup

4. Apply nominal voltage to the relay’s voltage inputs,

for example, 69 V

30 to phase A-B,

69 V

270 to phase B-C,

69 V

150 to phase C-A.

Apply 2x pickup current to phase A and B in forward direction,
for example, 2.0 A

30 to phase A and 2.0 A

210 to phase B, or

2.0 A

270 to phase B and 2.0 A

90 to phase C, or

2.0 A

150 to phase C and 2.0 A

330 to phase A.

-relay should not go into pickup,

-reset test current to zero A,

D