beautypg.com

Appendix d: acceptance test procedures, Isgs acceptance test – Siemens ISGS SG8158-00 User Manual

Page 73

background image

Appendix D: Acceptance Test Procedures

Siemens Energy & Automation, Inc.

67

ISGS Acceptance Test

Instantaneous Phase Overcurrent (50) Function

Set the ISGS as follows:
Parameter Set A

7103

5000:5 Current Transformer (CT)

1102

Curve SEA 5, Very Inverse

1702

20 A Nominal Pickup

1703

Time Dial 9.9

1705

Instantaneous Pickup 1 A

1501, 1502, 1503

Instantaneous Time Delay 0.0

1504

Trip Matrixed to Trip 1 Contact

6401

Phase

A B C

Connections
1. Connect the appropriate source of control voltage to terminals 13 (+) and 12 (-).

2. Connect suitable variable source current

to phase A on terminals 3 and 4,

to phase B on terminals 5 and 6,

to phase C on terminals 7 and 8.

3. Connect a timer to the trip contacts on terminals 1 and 2.

Pickup

4. Apply a current approximately 75% of the instantaneous pickup.

5. Raise the current and note the value of current at which the relay trips.

Trip LED illuminates.

Timer stops on trip.

Display shows TRIP 50 P1 (2, 3).

Trip log shows TRIP 50 P1 (2, 3) and the correct date and time.

Trip log shows value of current at trip.

Wisdom software records trip in event log.

Return current to zero and reset timer.

6. Set value of current slightly above Instantaneous Overcurrent pickup and record time required to trip.

Repeat above steps for phase B and phase C; repeat the same steps also for Parameter Set B.
Tests may be repeated at required settings.

CAUTION: Extended testing at high current levels may damage the relay. Note rat-

ings (Maximum Input Current) in Chapter 1, Section 1.5, Test Specifications.

D

isv3o_1.bk : isv3otst.frm Page 67 Wednesday, August 7, 1996 10:51 AM