Directional Phase Time Overcurrent (67) Function

(Phase-Neutral Connected VTs)

Set the ISGS as follows:
Parameter Set A

7103

5000:5 Current Transformer (CT)

1101

Curve SEA 5, Very Inverse

1902

1 A Nominal Pickup

1903

Time Dial per Chart

1905

Impedance to 45°

1907

Direction to Reverse

1908

Trip Matrixed to Trip 1 Contact

6401

Enable 67

1901

Disable Other Conflicting Functions

1501, 1551, 1601, 1651, 1801, 1901, 2001, 2301

Raise 51 Pickup to Maximum

1703

Phase

A B C

Connections
1. Connect the appropriate source of control voltage to terminals 13 (+) and 12 (-).

Relay Disabled contact on terminals 19 and 20 opens.

2. Connect suitable variable source current

to phase A, terminals 3 and 4,

to phase B, terminals 5 and 6,

to phase C, terminals 7 and 8,

3. Connect suitable AC voltage

to phase A, terminals 41 and 42,

to phase B, terminals 43 and 44,

to phase C, terminals 45 and 46,

Connect timer to Trip 1 contacts, terminals 1 and 2.

Pickup

4. Apply nominal voltage to the relay’s voltage inputs,

for example, 69 V

0 to phase A,

69 V

240 to phase B,

69 V

120 to phase C.

Apply 2x pickup current to phase A and B in forward direction,
for example, 2.0 A

30 to phase A and 2.0 A

210 to phase B, or

2.0 A

270 to phase B and 2.0 A

90 to phase C, or

2.0 A

150 to phase C and 2.0 A

330 to phase A.

-relay should not go into pickup,

-reset test current to zero A,

-increase phase A and phase B current in reverse direction until relay picks up (at 1.06 x pickup)
for example, 1.06 A

210 to phase A and 1.06 A

30 to phase B, or

1.06 A

90 to phase B and 1.06 A

270 to phase C, or

1.06 A

330 to phase C and 1.06 A

150 to phase A.