beautypg.com

Appendix d: acceptance test procedures, D acceptance test procedures, Isgs acceptance test – Siemens ISGS SG8158-00 User Manual

Page 69

background image

Appendix D: Acceptance Test Procedures

Siemens Energy & Automation, Inc.

63

D Acceptance Test Procedures

When performing the acceptance tests, follow the sequence listed here; first test protective function 51, then 50, etc.)

Note: The following procedures should be performed using accurately calibrated test equipment connected to a

source free of harmonics. Refer to Figure D.1 for connection diagram.

ISGS Acceptance Test

Phase Time Overcurrent (51) Function

Set the ISGS as follows:
Parameter Set A

7103

5000:5 Current Transformer (CT)

1101

Curve SEA 5, Very Inverse

1702

1 A Nominal Pickup

1703

Time Dial per Chart

1705

Trip Matrixed to Trip 1 Contact

6401

Disable Other Conflicting Functions

1501, 1551, 1601, 1651, 1801, 1901, 2001, 2301

Phase

A B C

Connections
1. Connect the appropriate source of control voltage to terminals 13 (+) and 12 (-).

Relay Disabled contact on terminals 19 and 20 opens.

2. Connect suitable variable source current

to phase A, terminals 3 and 4,

to phase B, terminals 5 and 6,

to phase C, terminals 7 and 8,

to neutral, terminals 9 and 10.

3. Connect timer to Trip 1 contacts, terminals 1 and 2.

Pickup

4. Increase current until relay picks up (this should occur at 1.06 x pickup.

Pickup LED illuminates.

Wisdom software records pickup in event log.

Return current to zero and reset timer.

Timing

5. Apply appropriate value of current for the test. The results match Table D.1.

Pickup LED illuminates.

Display shows PICKUP 51 P1 (2, 3).

Wisdom software records pickup in event log.

E

D

isv3o_1.bk : isv3otst.frm Page 63 Wednesday, August 7, 1996 10:51 AM