Assigning water sources to mainlines – Baseline Systems BaseStation 3200 V12 User Manual
Page 73
BaseStation 3200 Advanced Irrigation Controller Manual
3. Press the Enter button. The Booster Pumps
screen displays.
4. In the Decoder field, press the + button to
select the master valve decoder that you
want to set up as a booster pump.
5. Press the Next button to move to the Use As
Booster Pump field, and then press the +
button change the setting to Yes.
6. Press the Next button to move to the Select
Programs with Booster Pumps field, and
then press the + button to select the program that you want to assign the booster pump to.
7. When you have finished making changes, turn the dial to the RUN position.
Assigning Water Sources to Mainlines
The BaseStation 3200 supports 8 points of connection (water sources) and 8 mainlines. By default,
the mainlines are numbered in the controller from 1 – 8 regardless of whether your system has
more than one. All water sources are automatically assigned to mainline #1, but you can change
the settings to match your irrigation system’s watering topology. The following diagram illustrates
the model that the controller uses to manage these connections.
1. Turn the dial to the Flow position.
2. Press the Next button to highlight the Assign
Water Sources to Mainlines option.
3. Press the Enter button. The POC to Mainline
screen displays.
4. In the Point of Connection column, press the
+ or – button to highlight the POC that you
want to assign to a mainline.
5. Press the Next button to move to the
Mainline column, and then press the + or –
button to highlight the mainline that you
want to assign to that POC.
6. Press the Previous button to return to the Point of Connection column.
7. Repeat steps 4 - 6 until you have assigned all POCs to the corresponding mainlines.
Page 67