Turning the system's power switch on, Caution when turning the power switch on, Turning the power switch on – Toa N-8000 Series Ver.1.41 User Manual
Page 142: Setting procedures

4-12
Chapter 4: BEFORE PERFORMING SYSTEM SETTINGS…
2. TURNING THE SYSTEM'S POWER SWITCH ON
To perform system settings, the power supply needs to be connected to the system.
2.1. Caution When Turning the Power Switch On
Check the following to be sure before turning the power switch on:
Cables and connectors are correctly wired and connected.
The functional earth of Exchanges and Multi interface units is correctly grounded.
2.2. Turning the Power Switch On
Follow the procedures below to turn the power switch on.
Step 1. Turn the power switches on of the network equipment connected such as switching hubs, router, etc
on.
Step 2. Turn all exchanges', multi interface units' and IP stations' power switches on.
3. SETTING PROCEDURES
1. Set a network. (Refer to
Perform network settings (IP address, Default gateway, and Subnet mask) for all exchanges, Multi
interface units and IP stations connected to the local network. For network settings, refer to “Network
Settings Using a Personal Computer “ described on the next page.
2. Perform system settings. (Refer to
Use the supplied N-8000 Software program to perform individual settings related to the system such
as the Exchange, Multi interface unit, Station, Paging, etc.
3. Save the settings and upload to the units. (Refer to
Save the setting contents and write them into the Exchange, Multi interface unit, and IP stations.