Connecting peripherals, H_3509, H_3660 – BUCHI DuMaster D-480 User Manual
Page 110: H_546, H_559, H_778, H_779, O_2143
Operation Manual D-480
©BÜCH Labortechnik AG
6 - Starting up and shutting down the instrument
110
Filling the drying tube (on page 234).
Filling the combustion tube (on page 222).
Filling the post combustion tube (on page 223).
Filling the reduction tube (on page 224).
Install the required glass and quartz components. Leave the tube outlets open for subsequent
conditioning. Used tubes also need to be conditioned. See
Installing reaction tubes in the furnace and conditioning (on page 229).
Removing and installing the drying tube (on page 236).
The instrument is now ready for switching on.
Phase 2: Instrument must be ready to measure
Proceed as follows:
Perform all steps of the switching on process. See Switching on (on page 114).
Switch on the operating gases. See Default instrument settings (on page 114) for
recommended gas pressure.
Launch the operating software. The standard operating parameters are factory-set and do not
have to be optimized by the user. See Starting the operating software (on page 130).
Select the desired operating mode from the Mode menu. See Selecting the operating mode
(on page 131).
Heat up the furnaces and check parameter settings. See Heating up the furnace / checking
parameters (on page 118).
Define the main settings for measurement. See Measurement settings (on page 120).
The instrument is then ready to measure.
Phase 3: Performing instrument checks
Proceed as follows:
Perform a leak test. See Performing a leak test (on page 242).
If the leak test reveals any leaks, eliminate them.
Conditioning newly installed and used tubes For used tubes, humidity must be eliminated by
baking them out for at least two hours. See Installing reaction tubes in the furnace and
conditioning (on page 229).
Check proper working order of the instrument by means of
Blank value determination
Conditioning measurement,
Standard measurement
Observe gas flows and pressures. See Performing routine measuring work (on page 140).
After routine measuring work you can measure real samples. See Performing measurement
work (on page 136).
Connecting peripherals
Note
The following section is part of initial start-up. All steps described in initial startup before connecting
peripherals must have already been performed. See Start-up (on page 109).