Start-up, O_3659, H_542 – BUCHI DuMaster D-480 User Manual
Page 109: H_543, H_544
Operation Manual D-480
©BÜCH Labortechnik AG
6 - Starting up and shutting down the instrument
109
Category
Type
Part of initial equipment
Carrier gas
CO
2
:
Purity: 99.995 %
Consumption approx. 725 ml/min
Adjust the intake pressure at the
delivery point until the PC pressure
display "Input" reads 1300 mbar.
No
Combustion gas
Oxygen:
Purity: 99.995 %
Intake pressure 2.5 bar
Consumption approx. 0.5 - 1 l per
analysis
Reagents
Various chemicals for filling the reaction
tubes
Yes
You need a consumables set for
further analyses.
Calibration
standards
Aspartic acid
Glutamic acid
Substances must have at least p.a.
quality or be certified for elemental
analysis.
No
Start-up
Who performs first-time start-up?
First-time start-up is performed by a trained service technician, not the customer.
Note
In order to ensure proper working order of the instrument:
the work processes described in this section must be performed precisely.
the basic instrument and the peripherals must be switched on in the sequence described here.
Process
The section is divided into the following phases:
Preparing instrument for switching on
Preparing the Instrument for measurements
Performing instrument checks
Phase 1: Preparing instrument for switching on
Proceed as follows:
Set up the instrument. Observe the instructions concerning the installation site. See Installation
site requirements (on page 107).
Connect the peripherals. See Connecting peripherals (on page 110).
Connect supply lines and waste gas lines. See Connecting supply lines and waste gas lines
(on page 111).
Remove the transport lock. See Removing the transport lock.
Check the fillings of the required glass and quartz components. Replace filling if necessary. See