beautypg.com

Start-up, O_3659, H_542 – BUCHI DuMaster D-480 User Manual

Page 109: H_543, H_544

background image

Operation Manual D-480

©BÜCH Labortechnik AG

6 - Starting up and shutting down the instrument

109

Category

Type

Part of initial equipment

Carrier gas

CO

2

:

Purity: 99.995 %

Consumption approx. 725 ml/min

Adjust the intake pressure at the
delivery point until the PC pressure
display "Input" reads 1300 mbar.

No

Combustion gas

Oxygen:

Purity: 99.995 %

Intake pressure 2.5 bar

Consumption approx. 0.5 - 1 l per
analysis

Reagents

Various chemicals for filling the reaction
tubes

Yes

You need a consumables set for
further analyses.

Calibration
standards

Aspartic acid

Glutamic acid

Substances must have at least p.a.
quality or be certified for elemental
analysis.

No

Start-up

Who performs first-time start-up?

First-time start-up is performed by a trained service technician, not the customer.

Note

In order to ensure proper working order of the instrument:

the work processes described in this section must be performed precisely.

the basic instrument and the peripherals must be switched on in the sequence described here.

Process

The section is divided into the following phases:

Preparing instrument for switching on

Preparing the Instrument for measurements

Performing instrument checks

Phase 1: Preparing instrument for switching on

Proceed as follows:

 Set up the instrument. Observe the instructions concerning the installation site. See Installation

site requirements (on page 107).

 Connect the peripherals. See Connecting peripherals (on page 110).

 Connect supply lines and waste gas lines. See Connecting supply lines and waste gas lines

(on page 111).

 Remove the transport lock. See Removing the transport lock.

 Check the fillings of the required glass and quartz components. Replace filling if necessary. See