Supply output voltage, Supply warmup, I/o linking – Banner SureCross DX80 Wireless Networks User Manual
Page 17: Switch power

Supply Output Voltage
The Supply Output Voltage sets the voltage required for the sensor device. This parameter is only applicable when using the supplied
switch power option.
Supply Warmup
Supply Warmup defines the length of time the switch power should be turned on before examining the sensor’s input.
Warmup Time
0 Volts
Switch Power
Sample point
Sample point
Sample interval
Voltage
I/O Linking
Each device input point can be linked or connected to any output point in the system. An output link defined as zero for the device and
zero for the output point is not connected. Valid output points on all devices are nine through fourteen; valid devices are one through
fifteen with zero reserved for the Gateway (or GatewayPro).
In the sample screen shown, the Gateway input points can be mapped to any Node’s outputs. Manually enter the device number in the
Destination Device # box, then enter the I/O point number for that destination device.
After making changes to this screen:
1. Click on the Change button to send the changes to the DX83 Ethernet Bridge or the GatewayPro
2. Click on the Send button to send these changes to the device.
SureCross Web Configurator
rev. -
www.bannerengineering.com - tel: 763-544-3164
17