beautypg.com

Span your valves chapter 9 – Rockwell Automation 1771-QDC, D17716.5.93(Passport) PLASTIC MOLDING MODULE User Manual

Page 198

background image

Span Your Valves

Chapter 9

9-32

On

Worksheet

Confirm Your Configuration

With These Words or Bits

for Hold Pressure

ProĆSet Addr

8ĆC

Pressure vs Time algorithm

for Pack and Hold

HPC03ĆB02 = B00 = 0

B38/288, 290

Logical bridge to stop and set outputs before:

preĆdecompression

plastication

HPC03ĆB08 = 1

HPC03ĆB09 = 1

B38/296

B38/297

OpenĆloop control

HPC04ĆB03, B02, B01, B00 = 1

B38/304Ć307

Expert Response Compensation (ERC) = Off

HPC04ĆB11, B10, B09, B08 = 1

B38/312Ć315

Pressure setpoints

HPC10,13,16,19,22,27,30,33,36,

39 all equal full injection pressure

start @ N44:246

end @ N44:275

Time setpoints

HPC11,14,17,20,23,28,31,34,37

40 all equal to 1 second (100)

start @ N44:247

end @ N44:276

If these are not your current values, we suggest that you correct them now
and download them using the download procedure discussed in chapter 4.

Before proceeding, observe these warnings:

ATTENTION: As with any machine start-up, install a test
mold. Programming errors, configuration errors, or hydraulic
problems could lead to personal injury and/or machine damage.

ATTENTION: Be sure all machine guards and shields are in
place before proceeding to guard against personal injury.