beautypg.com

Installation – CHAMPION EEUCCW8 User Manual

Page 16

background image

8

Installation

Installation

Joining the Sections

1. Apply a 1/2" bead of FOOD GRADE

sealant to the foam gaskets on each

section.

2. Move the next section close to the "C".

Adjust the feet of this section to align

the 20 bolt holes around the hood.

3. Slide the connecting hoses and

clamps on drain pipes and cross-flow

pipes. Do not tighten

at this time.

4. Level each section side to side and

front to back making sure the section

connecting bolt holes align.

5. Make sure the sections are adjusted

to the same height.

This manual is related to the following products: