CHAMPION UL-130 Installation Instructions User Manual
Attention installers, Location, Fill booster tank
Undercounter Installation Instructions (High Temp.)
Attention Installers
All plumbing and electrical connections must be made by qualified installers in accordance
with all local plumbing and electrical codes.
Plumbing connections must be made BEFORE power is connected to the dishwasher.
Damage to the water heaters will result if power is turned on without adequate water supply.
!
!
All plumbing and electrical connections must be positioned to allow the unit to be removable
for service and cleaning.
!
1
Location
Place dishwasher in permanant location
Level dishwasher with 4 leveling feet
Level side to side and front to back
Remove front Panel
Booster Service Switch is located on the left side of
chemical pump bracket
Push Service Switch to “Booster Fill” position and
hold until water enters wash tank
Push Service Swtich to the “On” position.
Replace front panel. Installation is complete!
5
Fill Booster Tank
ON
OFF
Booster Fill
6 ft. fill hose supplied
3/4” garden hose fitting
2
Hot Water Supply
Hot Water Connection
Min. 140°F (60°C) for 40° rise
@ 20 PSI (138kPa) min. flow pressure
Min. 110°F (43°C) for 70° rise
@ 20 PSI (138kPa) min. flow pressure
Min 1/2” water supply line
4 ft. clear braided
drain hose supplied
3
Drain Connection
3/4” MNPT
by 5/8” hose adaptor
1-1/2” Wye fitting
* Maximum drain height: 3 ft.
0512242
REV
C
Remove front panel
Remove connection
box cover
Single Phase
208-240/60/1
115V split connection
3 wire plus ground
wire rated min 190°F (88°C)
Check data
plate for
electrical
power
requirements
4
Electrical Connections
L1
1
L2
L3
2
N
N
3
G
208/
240V
115V
115V
L2
L1
Neutral