Installation

Installation

Joining the Sections

1. Remove the shipping braces from the sections.
2. Identify the location of piping between the sections.

3. Check the height of each section and determine which

section is the highest due to floor variations.

4. Set the "C" section and adjust to its minimum height.

5. Level the "C" section side to side and front to back in

several places with a bubble level.

6. The remaining sections are leveled in relation to "C"

section.

7. Do not adjust the "C" section too high.

Identify piping..

Start leveling the section with the bullet feet

adjusted to a minimum height.