beautypg.com

Level setting, Standard delivery components, Cleaning – RADWAG MAX 60 Moisture Analyzer User Manual

Page 16: Plugging to mains

background image

- 16 -

4.3.

Level setting

Before plugging to mains, level the moisture analyzer using
adjustable feet. Turn the feet in a way that the air bubble of the
level is located centrally.

4.4.

Standard delivery components

A moisture analyzer MAX series

Insert of drying chamber basis.

Drying chamber shield.

Drying pan handle.

Drying pan bracket.

Disposable pan.

Power cord.

User manual.

4.5.

Cleaning

Remember to unplug the moisture analyzer from mains before any
cleaning activities.
Clean the moisture analyzer using a damp cloth by gentle rubbing
contaminated places.
Remember to remove the drying pan from the drying chamber before its
cleaning. If the drying pan assembly is installed while cleaning it may
damage instrument’s measuring system
, thus remove it from the bracket.

4.6.

Plugging to mains

A moisture analyzer can be plugged to mains only by means of original
power cord, which comes standard with the moisture analyzer. Rated
voltage (specified on device’s data plate) must be compatible with mains
rated voltage
.
The power cord can be connected only to socket with ground contact. Plug the
power cord to the moisture analyzer. The moisture analyzer’s power plug is
located at the back of instrument’s housing.
On plugging to mains moisture analyzer’s displays software’s name and
number, after which the indication changes to 0.000 g (in case of a moisture
analyzer with measuring accuracy 1 mg) or 0.0000 g (in case of a moisture
analyzer with measuring accuracy 0,1 mg). In mass indication is other than
zero press TARE key located on the overlay.

This manual is related to the following products: