beautypg.com

Acknowledging a data migration job, Acknowledging offline migration jobs – HP MPX200 Multifunction Router User Manual

Page 67

background image

Figure 32 Verifying jobs options dialog box

5.

The contents of the Verifying Jobs Options dialog box are identical to the Data Migration Jobs
Options dialog box. For an explanation of the selections on this dialog box, see

“Using the

data migration wizard” (page 55)

.

6.

To save the verifying jobs options, click Apply. Or, to discard changes to this job verification,
click Cancel.

Acknowledging a data migration job

The last action to complete a migration requires acknowledging the job. When you acknowledge
a completed data migration job, HP mpx Manager does the following:

Provides final synchronization of data between the source and destination LUN.

Creates a job report in the migration log and job report.

Removes the job from the system.

The sections that follow provide information on acknowledging migration jobs that are offline,
online/local, and online/remote.

Acknowledging offline migration jobs

When jobs are completed, HP mpx Manager transitions offline migration jobs, verify jobs, and
data scrubbing jobs to the Completed Data Migration Job page. For the router to release job
resources, you must acknowledge the job. Acknowledging a completed offline migration job can
be done at any time.

To acknowledge a completed offline data migration job:
1.

In the left pane of HP mpx Manager, click the Services tab, and in the left pane under a blade
node, click Data Migration Jobs.

2.

In the right pane, click the Completed Data Migration Jobs tab to bring that page to the front.

3.

On the Completed Data Migration Jobs page in the % Completed column, right-click a job
that is specified as 100%.

4.

On the shortcut menu, click Acknowledge Completed Data Migration.

5.

On the Confirm Acknowledgement dialog box, click Yes.

Acknowledging a data migration job

67