beautypg.com

Migration_report, Readjust_priority, Migration_report readjust_priority – HP MPX200 Multifunction Router User Manual

Page 100

background image

migration_report

Saves and uploads data migration reports in several file formats. To see example output from a
generated migration report, see

“Generating a data migration report” (page 73)

.

Authority

miguser

Syntax

migration_report

Keywords

Saves data migration report files.

save

Uploads the data migration report files to a server.

upload

Notes

To generate a data migration report:
1.

On the MPX200, issue the migration_report save command.

nl

The generated report is saved in the /var/ftp folder of the blade where the command is
issued.

2.

From a Windows or Linux machine, FTP to the MPX200 blade’s IP address where the report
was generated, and then get the report file named Migration_report.tar.gz.

Examples

The following example shows the migration_report save command:

MPX200 <1> (miguser) #> migration_report save
Successfully saved migration report. Package is Migration_Report.tar.gz
Please use FTP to extract the file out from the System.

The following example shows the migration_report upload command:

MPX200 <1> (admin) (miguser) #> migration_report upload
Migration report uploaded successfully on
http://172.35.14.183/put.php.

readjust_priority

Modifies the priority of serial scheduled jobs. Use this feature if you have more than 256 jobs that
must be executed sequentially. This operation is allowed only if the high priority jobs are completed,
and there is room for shifting the priority values on already configured jobs. This readjustment
reduces the priority value of the last job from 256 by the value of the priority of the currently running
serial job, and makes room to configure more serial jobs.

Authority

miguser

Syntax

readjust_priority

Examples

The following shows an example of the readjust priority command.

MPX200 <1> (miguser) #> readjust_priority

nl

Are you sure you want to adjust the priorities of serially
scheduled jobs that haven't started (y/n): y

nl

100 Command line interface