Set up – Spectra Precision Survey Pro v3.80 Recon iPAQ User Manual User Manual
Page 85
Fieldwork
77
Set Up
1.
Open the job that was created in the Traverse / Side Shot
Example.
a.
From the Main Menu, select
)LOH , 2SHQ 1HZ to open the
Open / New screen.
b.
Tap the file name that was created earlier
listed in the
Open Recent Job
list and then tap
2SHQ . The coordinates for that job are shown
here.
2.
Set the job settings. (Only the settings that affect
this example are covered here.)
a.
Select
-RE , 6HWWLQJV from the Main Menu.
b.
Tap the
Instrument
tab and set both the
Brand
and
Model
fields to
Manual Mode
.
c.
Tap the
Surveying
tab and confirm that all of
the checkboxes are unchecked.
d.
Tap the
Stakeout
tab and make sure the final
field (
Cut Sheet Offset Stored)
is set to
Actual
Offset
.
Note: When performing stakeout, you have the option of storing cut
sheet information. This information is stored in the raw data file,
and when using software on a PC, such as Survey Link, it can be
extracted in the form of a Cut Sheet Report.
e.
Tap OK to save the job settings.
3.
Setup your backsight. In this example, we will setup on Point 1
and backsight an object where it is assumed that the direction to
that object is known. When connected to a total station, you
would setup over your occupy point, aim toward the backsight
and zero the horizontal angle in the total station before
continuing.
a.
Access the
6XUYH\ , %DFNVLJKW 6HWXS screen.