beautypg.com

Spectra Precision Survey Pro v3.80 Recon iPAQ User Manual User Manual

Page 111

background image

Road Layout

103

33.

We now need to repeat the above steps for the right side of the
road. Tap

in the

R

ight column to select that side of the

road and then tap the

$GG« button to open the Add Right Super

Elevation screen.

34.

Enter the following data just as you did for the left
side of the road and then tap OK.

Start Station: 1+0
End Station: 1+25
Start Slope: -2
End Slope: -8

(notice this is a negative value)

Parabolic Transition Start: 0.0
Parabolic Transition End: 0.0
Hinge on:

&HQWHU

35.

With

selected in the

R

ight column, tap the

$GG« button again to add the final super

elevation.

36.

Enter the following data to describe the second
super elevation on the right side of the road and
then tap OK.

Start Station: 2+0
End Station: 2+25
Start Slope: -8
End Slope: -2
Parabolic Transition Start: 0.0
Parabolic Transition End: 0.0
Hinge on:

&HQWHU

37.

This completes the definition for an entire road
including templates, widenings and super
elevations. To make sure there are no errors, tap

&KHFN«. You should get a message stating

success.

38.

Tap OK to save the road.

You are now ready to stake the road in the field. Close any open
windows to return to the Main Menu.