Spectra Precision Survey Pro v3.80 Recon iPAQ User Manual User Manual
Page 110
User’s Manual
102
26.
We now need to add a super elevation at the end of
the curve on the left side of the road to change the
slope back to -2%.
27.
With
selected in the
L
eft column, tap the
$GG« button again.
28.
From the Add Left Super Elevation screen we will
start the transition out of the super elevation, 200
feet from the beginning of the road so enter
2+00
in
the
Start Station
field.
29.
The super elevation will return to the original slope
after 25 feet so enter
2+25
in the
(QG 6WDWLRQ field.
30.
The start slope must be the same as the slope of the
road where it leads into the super elevation, so leave
the
Slope 1
field set to 8.
31.
We want the ending slope to be -2% so in the
Slope 2
field, enter
-2
. Leave the parabolic transition fields set to 0.
32.
Be sure the
Hinge on
field is toggled to
&HQWHU and
then tap OK to continue. This will complete the super elevation
entries for the left side of the road.