Spectra Precision Survey Pro v3.80 Recon iPAQ User Manual User Manual
Page 113
Road Layout
105
segment
field. (A positive offset value extends away from the
centerline.)
9.
Once the correct station to stake is entered and the desired node
is selected, tap the
1H[W ! button to continue.
10.
The next screen that opens is identical to the screens
used in point staking, since that is essentially what
is occurring at this point. If you are not familiar
with Point Staking, refer to Page 78.
11.
Once the point is staked and stored, you will return
to the screen described above where a new node can
be selected and staked or the station to stake can be
advanced by the station interval by tapping the
1H[W 6WD button.