beautypg.com

7 i/o signal timings – IAI America PCON-CFA User Manual

Page 147

background image

3. SCON-CA/CF

A

141

3.7 I/O

Signal

Timings

When any of the control signal is turned ON to perform the operation of the robot cylinder using the PLC's
sequence program, the response (status) is returned to the PLC. The maximum response time is expressed
using the following formula.

Maximum response time (msec)

ዙYt+xt+3+ command processing time (operation time, etc.)

Yt: Master Stationĺslave transmission delay time
xt: SlaveĺMaster Station Transmission Delay Time


Master Stationĺ For the master station ĺ slave transmission delay (Yt) and slave ĺ master station

transmission delay (xt), refer to the Operation Manuals for the EtherCAT(R) master unit
and PLC installed in the master unit.

















Filed Network Transmission
Delay Time

PLC sequence program

Control Signal

Status Signal

Control Signal

Status Signal

Slave

Transmission delay time (Yt)

Slave
Transmission delay time (Xt)

Command processing time

Master station

Master station

PCON

This manual is related to the following products: