beautypg.com

R&M Materials Handling WIRE ROPE HOISTS Service User Manual

Page 78

background image

R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319

78/130

R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.

13-14 25 194 65 23 M10 15
15-16 30 220 65 25 M12 18


• Check that the rope clamp-nuts are tight.

• Ensure that the rope has not slipped in the rope anchorage by comparing the measures with the

stated measures in the table.

• Make sure the rope end protrudes from the rope anchorage as specified on table.

• Check the condition of the rope at point “A”.

• Ensure that the rope is assembled inside the rope anchorage correctly.

5.28.2 Assembly

5

6

7

1

4

3

2

c_roan01_d000491c

1. Rope
2. Rope anchorage
3. Wedge
4. Rope clamp
5. Split-pin
6. Washer
7. Shaft


Disassembly:
• Lower the hook onto a stable platform. Pull some more rope off the drum with a gloved hand.

• Switch OFF the power supply to the hoist.

• Remove the split-pin (5).

• Remove the washers (6) and the shaft (7) while holding the rope anchorage (2).

• Slide the rope anchorage out of the overload device.

• Remove the rope clamps (4).
• Tap the wedge (3) out of the rope anchorage and remove the rope (1).