beautypg.com

4 stacking scenario examples, Figure 15 stacking example 1 – ZyXEL Communications ZyXEL Dimension ES-4024 User Manual

Page 47

background image

ES-4024A User’s Guide

46

Chapter 3 Hardware Overview

3.4 Stacking Scenario Examples

Use Ethernet cables when stacking the switches. See the following figures for example
stacking scenarios using the stacking module. The switches must form a closed ring in all
scenarios.

Figure 15 Stacking Example 1

100/1000

Green

On

The link to a 1000 Mbps Ethernet network is up.

Amber

On

The link to a 100 Mbps Ethernet network is up.

Off

The link to an Ethernet network is down.

ACT

Green

Blinking

The port is receiving or transmitting data.

On

The port has a connection to an Ethernet network but not

receiving or transmitting data.

Off

The link to an Ethernet network is down.

LNK (mini

GBIC

Slots)

Green

On

The port has a successful connection.

Off

No Ethernet device is connected to this port.

ACT(mini

GBIC

Slots)

Green

Blinking

The port is sending or receiving data.

Off

The port is not sending or receiving data.

Table 2 Front Panel LEDs (continued)

LED

COLOR

STATUS

DESCRIPTION