Installing the equipment, Installing the 10u chassis, 4.2. installing the equipment – Sagem 4450E User Manual
Page 76
SAGEM 3P@C
3P@C Installation Manual
Page 4-15
Reproduction and communication in any form prohibited without the written permission of SAGEM SA
Figure 4-19 Guide rail
Screw hole
Guide rail
The front view of the installed guide rails is illustrated in the following figure.
Figure 4-20 Front view of the guide rails installed
4.2.
4.2.
4.2.
4.2. Installing the Equipment
3P@C 4450E must be installed in a cabinet. Since it is heavy and of a large volume, two persons are needed to
cooperate with each other in the installation process. To install it, first install the 10U chassis, then the fan
module and finally the air deflector frame. The specific procedure is as follows:
4.2.1.
4.2.1.
4.2.1.
4.2.1. Installing the 10U Chassis
prompt
If the 10U chassis has been mounted with hangers, you can
skip Step 1 and start the installation directly from Step 2.
Step 1
Mount the hangers with screws provided in the installation
accessories onto the 10U chassis, as shown in the following figure.
In the process, make sure the hangers are mounted in the correct
direction; otherwise the switch would not be able to be placed in
the standard cabinet.