Unpacking for acceptance, Preparation, 3.5.1. preparation – Sagem 4450E User Manual
Page 56: Sagem 3p@c
SAGEM 3P@C
3P@C Installation Manual
Page 3-9 Reproduction and communication in any form prohibited without the written permission of
SAGEM SA
Item
Optional Component
maximum
configuration
Accessories
Needed
9
2-port 100M multi-mode optical
interface module (
DS-2FMM)
2×2
-----
10
2-port 100M single-mode optical
interface module (
DS-2FSM)
2×2
-----
11
1-port 155M long-wave single-mode
ATM interface module (DS-A155SM)
2×2
-----
12
1-port 155M short-wave multi-mode
ATM interface module (DS-A155MM)
2×2
-----
prompt
The maximum configuration quantity given in the above
table is applicable to each general chassis of 3P@C 4450E.
3.5. Unpacking for Acceptance
Note
Keep the equipment waterproof and shock-proof during its
transportation. After the equipment arrives at the destination
for installation, do not handle it roughly but keep it away
from sunlight and rain.
3.5.1.
3.5.1.
3.5.1.
3.5.1. Preparation
1.1.1.29
1.1.1.29
1.1.1.29
1.1.1.29
Checking
the
packages
Before unpacking, check if the packing box is intact and if the equipment model is consistent with
that specified in the purchase contract.
Note
If the packing box is damaged or the equipment model is
inconsistent, please keep the original condition and contact
the local office of SAGEM sa.
1.1.1.30
1.1.1.30
1.1.1.30
1.1.1.30
Unpacking
tools
The needed tools for unpacking include a claw hammer or screwdriver and an antistatic wrist strap.
1.1.1.31
1.1.1.31
1.1.1.31
1.1.1.31
Participants
Both the customer and the engineering staff (engineers or representatives of SAGEM sa) should
be present during the unpacking. Otherwise, any goods problem shall be borne by the unpacking
party.